Harbor Bridge Project corporate office is located in 1620 N Port Ave, Corpus Christi, Texas, 78401, United States and has 11-50 employees.
harbor bridge project
flatiron/dragados llc
flatiron & dragados llc
flatiron dragados llc
flatiron dragados llc, port office
flatiron/dragados
Departments
Number of employees
Operations
10
Engineering & Technical
5
Finance
2
Human Resources
1
Marketing
1
Sales
1
| Location | People at location |
| North America | 11-50 |
Explore people who held key positions, contributed to Harbor Bridge Project's success, and advanced their careers.
Superstructures Superi... at Louisiana Bridge Build...
Worked as Segment & Upper Pylon Erection General Foreman...
at Harbor Bridge Project
Senior Project Manager at Ballard Marine Constru...
Worked as Project Manager I, II -405 Widening
at Harbor Bridge Project (2023-2025)
Senior Manager, Qualit... at Sundt
Worked as Manager, Quality Assurance
at Harbor Bridge Project (2019-2025)
Program Manager, Membe... at Regional Hispanic Cont...
Worked as DBE Coordinator
at Harbor Bridge Project (2017-2019)
Vice President, Qualit... at FlatironDragados
Worked as Vice President, Quality (North America)
at Harbor Bridge Project
Explore More
The Harbor Bridge Project is focused on the construction of a new cable-stayed bridge in Corpus Christi, Texas, which will be the tallest structure in South Texas and the longest cable-stayed bridge in the United States. The project includes over six miles of bridge and connecting roadway, featuring aesthetic elements such as a shared-use path, com... Read More