Harbor Bridge Project corporate office is located in 1620 N Port Ave, Corpus Christi, Texas, 78401, United States and has 11-50 employees.
harbor bridge project
flatiron/dragados llc
flatiron & dragados llc
flatiron dragados llc
flatiron dragados llc, port office
flatiron/dragados
Departments
Number of employees
Operations
9
Engineering & Technical
5
Finance
2
Marketing
1
Human Resources
1
Sales
1
| Location | People at location |
| North America | 11-50 |
Explore people who held key positions, contributed to Harbor Bridge Project's success, and advanced their careers.
Senior Project Manager at Ballard Marine Constru...
Worked as Project Manager I, II -405 Widening
at Harbor Bridge Project (2023-2025)
Assistant Director, He... at University of Texas at...
Worked as Public Information Intern
at Harbor Bridge Project (2016-2018)
Manager, Manufacturing... at Caterpillar
Worked as Field Engineer
at Harbor Bridge Project (2020-2020)
Senior Methods and Tem... at Pomerleau
Worked as Cable Stay Bridge Engineer
at Harbor Bridge Project (2024-2024)
Superstructure Superin... at FlatironDragados
Worked as Structure Foreman
at Harbor Bridge Project (2017-2021)
Superintendent at Massman Construction
Worked as Straddle Crane Operator
at Harbor Bridge Project (2018-2020)
Explore More
The Harbor Bridge Project is focused on the construction of a new cable-stayed bridge in Corpus Christi, Texas, which will be the tallest structure in South Texas and the longest cable-stayed bridge in the United States. The project includes over six miles of bridge and connecting roadway, featuring aesthetic elements such as a shared-use path, com... Read More