Douglas's profile was created using:
Sort By:

1-5 of 5 online sources for Douglas Kim

  • View Online Source
    Welcome To The Windward Agency! - [Cached Version]
    Published on: 11/14/2006    Last Visited: 11/28/2007  

    The Mineral Resource estimates have been prepared in accordance with the Canadian National Instrument 43-101 based on drilling data compiled by Douglas Kim, P.Geo., Resource Development Manager, Sabina Silver Corporation and the resource estimation by Pierre Desautels, P.Geo., Senior Geologist, Wardrop Engineering Inc. both of whom are Qualified Persons as defined in Canadian National Instrument 43-101.

  • View Online Source
    Welcome To The Windward Agency! - [Cached Version]
    Published on: 3/5/2007    Last Visited: 11/28/2007  

    The resource estimation was reviewed by Douglas Kim , P.Geo., Executive Project Manager for Sabina and a Qualified Person under NI43-101.Mr. Kim has verified the methods used to determine grade and tonnage in the resource model and reviewed the contents of this news release.The NI 43-101 technical report documenting these results has been filed concurrently on www.sedar.com with this news release and is available for viewing.

    All of the above are independent of the Company except for Mr. Kim.

  • View Online Source
    Welcome To The Windward Agency! - [Cached Version]
    Published on: 9/20/2006    Last Visited: 11/28/2007  

    The Hackett River drill program is being carried out under the supervision of Douglas Kim, P.Geo.Resource Development Manager and a Qualified Person under National Instrument 43-101.Mr. Kim supervised drill hole planning, implementation and application of a quality assurance/quality control (Qa/Qc) sampling system incorporating the regular use of sample standards, blanks and duplicates and has approved the technical content of this news release.

  • View Online Source
    Welcome To The Windward Agency! - [Cached Version]
    Published on: 7/25/2006    Last Visited: 11/28/2007  

    The Hackett River drill program is being carried out under the supervision of Douglas Kim, P.Geo.Resource Development Manager and a Qualified Person under National Instrument 43-101.Mr. Kim supervised drill hole planning, implementation and quality control programs and has approved the technical content of this news release.

  • View Online Source
    Welcome To The Windward Agency! - [Cached Version]
    Published on: 11/1/2006    Last Visited: 11/28/2007  

    The Hackett River drill program was carried out under the direction of Harvey Klatt, P.Geo., Project Manager and Douglas Kim, P.Geo.
    ...
    Mr. Kim supervised drill hole planning, implementation and application of a quality assurance/quality control (Qa/Qc) sampling system incorporating the regular use of sample standards, blanks and duplicates and has approved the technical content of this news release.

Wrong Person?

Try these instead
Related searches
More...

Copyright © 2009 Zoom Information Inc. All rights reserved.

BBeachHead-2009-09-28_RC001.1 OM11