Please Note:
This profile was automatically generated using 3 references found on the Internet. This information has not been verified. Learn more...
This profile was automatically generated using 3 references found on the Internet. This information has not been verified. Learn more...
Web References
-
1. www.assetrecoverynews.com
www.assetrecoverynews.com/haza - [Cached]Published on: 11/23/2007 Last Visited: 11/23/2007
Pictured left to right, Meghan Cassidy with the EPA, Mike McCluskey DES Project Manager, Patricia Haederly with KeySpan, Nancy Smith with the EPA, John Regan with DES, and Jim Ash with GEI Consultants.Cost overruns have long been a signature feature of the $1 billion environmental cleanup of the old Mound atomic plant, originally estimated at half that amount. -
2. $300 million cleanup ready to commence (November 14, 2003)
www.capecodonline.com/cctimes/ - [Cached]Published on: 11/14/2003 Last Visited: 2/19/2004
Without those chemicals in the soil, rain won't cause them to leach into the groundwater, said Meghan Cassidy, an EPA team leader on the Camp Edwards cleanup.
Cleanup processShe said the Demolition 1 area has already produced an enormous plume. "This is a very large source area," she said. -
3. It
www.rumbonews.com/RUMBO%20AUGU - [Cached]Published on: 11/14/2001 Last Visited: 7/3/2004
Cosgrove is informing the project manager Meghan Cassidy of the EPA that the Town hopes to negotiate an easement to a portion of the Gleason Street property to develop a Riverwalk.
...
Next is a letter from TRC (Company contracted to test various contaminated sites in Methuen under the Brownfields Program funded by the EPA), dated April 1, 1999, it is addressed to Alan Peterson, EPA, with copies to Joe Cosgrove and Meghan Cassidy.

