Last Update

2016-04-01T00:00:00.000Z

This profile was last updated on .

Is this you? Claim your profile.

Wrong Michael Spacek?

Michael D. Spacek

P.E., Cem, Leed AP Director of Energy Services

Process Systems LTD

HQ Phone: (419) 433-7048

Email: m***@***.com

Get ZoomInfo Grow

+ Get 10 Free Contacts a Month

Please agree to the terms and conditions

I agree to the Terms of Service and Privacy Policy. I understand that I will receive a subscription to ZoomInfo Community Edition at no charge in exchange for downloading and installing the ZoomInfo Contact Contributor utility which, among other features, involves sharing my business contacts as well as headers and signature blocks from emails that I receive.

Process Systems LTD

205 Sprowl Road

Huron, Ohio 44839

United States

Company Description

Engineered Process Systems is based in Huron, Ohio, on Lake Erie. Our immediate service area covers the entire state of Ohio, and surrounding regions including: northern Kentucky, western Pennsylvania, northern Tennessee, eastern Indiana, northern West Vi ... more

Find other employees at this company (1,212)

Background Information

Web References (18 Total References)


Lorain Journal: Ohio RPS Law Starts Wind Power

www.greenenergyohio.org [cached]

Michael Spacek, left, and Glen Ginesi flank a 10,000-watt wind turbine at Engineered Process Systems on Sprowl Road in Huron.

...
Turtle, located in the industrial park off Baumhart Road in Lorain, is proceeding with their wind turbine ambitions with Mike Spacek, general manager of Engineered Process Systems, a Huron company that sells and installs wind turbines. Spacek is optmistic about the industry's future.
''The possibility for wind in northern Ohio is tremendous,'' said Spacek.
Spacek, along with company president Glen Ginesi, have their own operational 10 kilowatt turbine at their business in Huron.
...
The proposed 20-kilowatt tower for Turtle would be around 60 feet tall with three blades filling out a 16-foot wingspan, according to Spacek.
...
The state currently offers industrial grants that cover up to 50 percent of the installation cost or a maximum of $150 thousand, according to Spacek.
''The state has canceled the residential grant programs,'' Spacek said.


Gaining zoning approval was key to ...

www.starbeacon.com [cached]

Gaining zoning approval was key to the project, said Michael Spacek, director of energy services for Engineered Process Systems of Huron. EPS will design and engineer the turbines for NexGen Energy of Boulder, Colo.

Next, the company must firm up its grant process and then secure interconnection agreements with FirstEnergy, Spacek said. That step will require the creation of engineered drawings, he said.
Barring snags, construction could begin on the big machines by late winter or early spring, Spacek told the board.
...
NexGen can move fast on its turbine projects because the company already has in storage the parts needed to build the big machines, Spacek said.
...
A fence will be erected to keep the curious a safe distance away, Spacek said.
The turbine at the waste water plant will stand within a fence that already protects the facility.
Noise will not be a problem, Spacek said. The turbines will be engineered to create less noise than the ambient sound in the area, he said.


Gaining zoning approval was key to ...

www.starbeacon.com [cached]

Gaining zoning approval was key to the project, said Michael Spacek, director of energy services for Engineered Process Systems of Huron. EPS will design and engineer the turbines for NexGen Energy of Boulder, Colo.

Next, the company must firm up its grant process and then secure interconnection agreements with FirstEnergy, Spacek said. That step will require the creation of engineered drawings, he said.
Barring snags, construction could begin on the big machines by late winter or early spring, Spacek told the board.
...
NexGen can move fast on its turbine projects because the company already has in storage the parts needed to build the big machines, Spacek said.
...
A fence will be erected to keep the curious a safe distance away, Spacek said.
The turbine at the waste water plant will stand within a fence that already protects the facility.
Noise will not be a problem, Spacek said. The turbines will be engineered to create less noise than the ambient sound in the area, he said.


The board used a work session ...

www.presspublications.com [cached]

The board used a work session earlier this month to hear a presentation on wind power by Michael Spacek, of Engineered Process Systems.


OAK HARBOR --At the last ...

www.portclintonnewsherald.com [cached]

OAK HARBOR --At the last Benton-Carroll-Salem School Board of Education work session, Michael Spacek of Engineered Process Systems gave a presentation to the board members on wind power as an alternative energy source to reduce operating costs.

Advertisement>
With the rising costs of natural gas, heating oil and electricity, the board is reviewing all options to operate the schools in the most economical means possible.
With assistance through state grants, a wind-powered turbine would have a payback period of approximately seven to 10 years, Spacek said.

Similar Profiles

Other People with this Name

Other people with the name Spacek

Linda Spacek
Texas Municipal Human Resource Management Association

Megan Spacek
//www.riceowls.com/

David Spacek
Illinois Department of Transportation

Nick Spacek
SITEFLO

Michael Spacek
RE/MAX Grand

Browse ZoomInfo's Business Contact Directory by City

Browse ZoomInfo's
Business People Directory

Browse ZoomInfo's
Advanced Company Directory