logo

Last Update

This profile was last updated on 9/15/2016 and contains contributions from the  Zoominfo Community.

is this you? Claim your profile.

Wrong David Plante?

David L. Plante

Lead Project Manager

Northeast Utilities

HQ Phone:  (860) 665-5000

Direct Phone: (603) ***-****direct phone

Email: d***@***.com

GET ZOOMINFO GROW

+ Get 10 Free Contacts a Month

Please agree to the terms and conditions.

I agree to the  Terms of Service and  Privacy Policy. I understand that I will receive a subscription to ZoomInfo Grow at no charge in exchange for downloading and installing the ZoomInfo Contact Contributor utility which, among other features, involves sharing my business contacts as well as headers and signature blocks from emails that I receive.

THANK YOU FOR DOWNLOADING!

computers
  • 1.Download
    ZoomInfo Grow
    v sign
  • 2.Run Installation
    Wizard
  • 3.Check your inbox to
    Sign in to ZoomInfo Grow

I agree to the Terms of Service and Privacy Policy. I understand that I will receive a subscription to ZoomInfo Community Edition at no charge in exchange for downloading and installing the ZoomInfo Contact Contributor utility which, among other features, involves sharing my business contacts as well as headers and signature blocks from emails that I receive.

Northeast Utilities

107 Selden St

Berlin, Connecticut,06037

United States

Company Description

Eversource (NYSE: ES) transmits and delivers electricity and natural gas to more than 3.6 million electric and natural gas customers in Connecticut, Massachusetts and New Hampshire. Recognized as the top U.S. utility for its energy efficiency programs by the s...more

Background Information

Employment History

Project Manager

PSNH


Project Manager-Transmission Business

Public Servie of New Hampshire


Transmission Line Engineer

Public Service Company of New Hampshire


Web References(8 Total References)


Projects - Saco Valley Substation Upgrade

www.trcsolutions.com [cached]

Second Row: Steve Pierce, Manager- New Hampshire Operations, TRC; David Plante, Project Manager, PSNH; Jim Jiottis, Engineering Manager, PSNH; Brandon Davies, Electrical Engineer, TRC
First Row: Melanie Gosselin, Executive Director, New Hampshire Food Bank; Laurie Aylsworth, Vice President- Transmission, Northeast Utilities; David Plante, Project Manager, PSNH


www.highlandernews.com

The cafe's manager, Dave Plante, said the extension will offer a bit more room for waiting patrons to stand inside, but they fully intend to keep that line snaking out the door into the parking lot.


www.cooscountydemocrat.com

Once through the Gateway, the train was halted once again, and the load was shifted three inches to the right, restoring its original center of gravity, explained PSNH project manager David Plante, who works in PSNH's Energy Park in Manchester.
In February L-KOPIA, a Swedish company, measured all the clearances on the rail route, sending a truck, on which a laser unit was mounted, over the tracks. Bridge engineer Duffet took the computerized results, plugged in what the dimensions of the Schnabel would be once the hefty transformer was incorporated, and figured out which would be the tight spots, such as the through-truss bridge at Fabyans and the Gateway. This allowed the contractor Marino Crane, a division of Barnhart NE which together with Salt-Lake-City-based England Logistics master-minded the transformer's delivery, to anticipate that a shift would be required at the Gateway, Mr. Plante said. The phase shifting transformer being installed at the PSNH 115kV Saco substation is designed to act, in effect, as an on-off power valve and not for transferring voltage, Mr. Plante said. The costly equipment is being inserted near the Maine-New Hampshire "transmission interface" to avoid overloading the electrical system and to ensure greater reliability for the region by creating a dual feed setup in case problems arise. "PSNH worked closely with Maine Central Power to coordinate our respective upgrades on what is a regional project," Mr. Plante said. Delivering and installing 50,000 gallons of transformer oil to insulate and cool the new costly piece of equipment will be one of the last steps in putting it into operation, Mr. Plante said.


www.burlingtonfreepress.com

Manager David Plante says service has picked up quite a bit and they've gotten a great response from the public, especially the Night Owls, with the most popular dish so far being the marinated grilled steak with port wine demi glace, horseradish sauce and French fries.
The Early Bird is served from 4-5:45 p.m.; the Night Owl from 9 p.m.-close.


www.burlingtonfreepress.com

Standing outside Leunig's Bistro, manager David Plante watched a CCTA bus slow to a stop to allow pedestrians to pass.The brakes squealed slightly, but no one seemed to notice."Hear that little squeak?Imagine that amplified 100 times," he said.Plante has fought the noise by closing windows.


Similar Profiles

city

Browse ZoomInfo's Business
Contact Directory by City

city

Browse ZoomInfo's
Business People Directory

city

Browse ZoomInfo's
Advanced Company Directory