About | Free Trial

Last Update

2016-04-19T00:00:00.000Z

This profile was last updated on // .

Is this you? Claim your profile.

Wrong Darren Salyards?

Mr. Darren Salyards S.

Project Executive

Rosendin Electric , Inc.

Direct Phone: (804) ***-****       

Email: d***@***.com

Rosendin Electric , Inc.

880 Mabury Rd

San Jose, California 95133

United States

Company Description

Rosendin Electric is committed to continuously improving the way we work, providing a safe work environment, enhancing supplier performance and exceeding customer expectations. We believe the quality in our work will represent us for years to come. We kno ... more

Find other employees at this company (1,773)

Background Information

Web References (21 Total References)


ACC NECA -Leadership

www.accneca.org, $reference.date [cached]

Darren S. Salyards Truland Service Corp. 5300 S. Laburnum Ave. Richmond, VA 23231 804-652-2801 * Fax 804-652-1821


ACC NECA - Membership Directory

www.accneca.org, $reference.date [cached]

Mr. Darren Salyards Email: dsalyards@truland.com


"Intensive coordination between ...

www.ecmag.com, $reference.date [cached]

"Intensive coordination between Truland and the mechanical and plumbing contractors was essential for integrating the new systems without impacting the historic aspects of the building," said Darren Salyards, Truland's senior project manager.

...
"In those instances, we worked with the construction manager and engineers to formulate solutions, which were then incorporated into the project," Salyards said.
...
"The VESDA system, which samples air regularly through a tube to determine the presence of smoke in the building, was chosen because it provides the earliest possible warning of a fire and because it can be more easily concealed," Salyards said.
No lights without power
Lighting was a major issue for the renovation portion of the project.Each light fixture had its own specification detail as to how it should be built.Many of the fixtures, according to Salyards, were custom built and intended to replicate the originals in order to maintain the building's architectural integrity.
"The general contractor, however, was responsible for removing and restoring original sconces and chandeliers before we reinstalled them," he said.
...
Power from the utility, according to Salyards, was also routed for use in the new extension.
"Large chases had to be cut into the Capitol's walls to run the wiring throughout the building to power equipment, receptacles and switches," Salyards said.
The biggest challenge for Truland with all the systems the company installed was to keep all electrical and mechanical components out of sight.
"The architect wanted the look of undisturbed plaster walls, which meant we had to ensure that the design and installation of the conduit remained behind walls, above ceilings and under floors," Salyards said.


"Intensive coordination between ...

www.ecmag.com, $reference.date [cached]

"Intensive coordination between Truland and the mechanical and plumbing contractors was essential for integrating the new systems without impacting the historic aspects of the building," said Darren Salyards, Truland's senior project manager.

...
"In those instances, we worked with the construction manager and engineers to formulate solutions, which were then incorporated into the project," Salyards said.
...
"The VESDA system, which samples air regularly through a tube to determine the presence of smoke in the building, was chosen because it provides the earliest possible warning of a fire and because it can be more easily concealed," Salyards said.
No lights without power
Lighting was a major issue for the renovation portion of the project. Each light fixture had its own specification detail as to how it should be built. Many of the fixtures, according to Salyards, were custom built and intended to replicate the originals in order to maintain the building's architectural integrity.
"The general contractor, however, was responsible for removing and restoring original sconces and chandeliers before we reinstalled them," he said.
...
Power from the utility, according to Salyards, was also routed for use in the new extension.
"Large chases had to be cut into the Capitol's walls to run the wiring throughout the building to power equipment, receptacles and switches," Salyards said.
The biggest challenge for Truland with all the systems the company installed was to keep all electrical and mechanical components out of sight.
"The architect wanted the look of undisturbed plaster walls, which meant we had to ensure that the design and installation of the conduit remained behind walls, above ceilings and under floors," Salyards said.


"Intensive coordination between ...

www.ecmag.com, $reference.date [cached]

"Intensive coordination between Truland and the mechanical and plumbing contractors was essential for integrating the new systems without impacting the historic aspects of the building," said Darren Salyards, Truland's senior project manager.

...
"In those instances, we worked with the construction manager and engineers to formulate solutions, which were then incorporated into the project," Salyards said.
...
"The VESDA system, which samples air regularly through a tube to determine the presence of smoke in the building, was chosen because it provides the earliest possible warning of a fire and because it can be more easily concealed," Salyards said.
No lights without power
Lighting was a major issue for the renovation portion of the project. Each light fixture had its own specification detail as to how it should be built. Many of the fixtures, according to Salyards, were custom built and intended to replicate the originals in order to maintain the building's architectural integrity.
"The general contractor, however, was responsible for removing and restoring original sconces and chandeliers before we reinstalled them," he said.
...
Power from the utility, according to Salyards, was also routed for use in the new extension.
"Large chases had to be cut into the Capitol's walls to run the wiring throughout the building to power equipment, receptacles and switches," Salyards said.
The biggest challenge for Truland with all the systems the company installed was to keep all electrical and mechanical components out of sight.
"The architect wanted the look of undisturbed plaster walls, which meant we had to ensure that the design and installation of the conduit remained behind walls, above ceilings and under floors," Salyards said.

Similar Profiles

Other People with this Name (245)

Other people with the name Salyards

Jeff Salyards
American Bar Association

Daryl Salyards
OHL

Michael Salyards
Maple Lane Realty Llc

Matthew Salyards
U.S. Coast Guard

Matthew Salyards
Fairfax County Public Schools

Browse ZoomInfo's Business Contact Directory by City

Browse ZoomInfo's
Business People Directory

Browse ZoomInfo's
Advanced Company Directory